Interior renovations

Thoughtful details. A fresh start.

Create a bathroom that feels comfortable, looks cohesive, and is easier to use. From ceramic tile floors to fully tiled showers, our work focuses on preparation, waterproofing within the selected system, careful tile placement, and clean finishing.

Know what you’re investing in

Beautiful tile starts
behind the tile.

A bathroom renovation brings together water management, support, drainage, ventilation, and finishes. A fully tiled shower depends on the assembly underneath the surface—not on the tile pattern alone.

01

Framing, subfloor & backing

The supporting surfaces need to be suitable for the tile assembly. Movement, damaged wood, or unsuitable backing can undermine an otherwise attractive finish.

02

A continuous waterproofing system

Tile and grout are not a substitute for waterproofing. The selected membrane or shower-liner assembly manages moisture at walls, the base, corners, and transitions.

03

Shower base, slope & drain

The shower floor must direct water to a compatible drain. The connection between waterproofing and the drain is a critical part of the chosen system.

04

Corners, niches & penetrations

Benches, niches, curbs, pipe openings, and changes of plane require coordinated waterproofing and sealing details. These are part of the system, not just decorative extras.

05

Tile setting, joints & finishing

Appropriate setting materials, tile coverage, grout, and movement joints help the surface perform. Sealant at the correct transitions serves a different purpose from grout.

06

Plumbing & ventilation coordination

Valve locations, drain work, fixture connections, and exhaust ventilation are planned alongside the tile work. The proposal identifies who performs each trade and what is included.

Homeowner background: Schluter shower waterproofing. Final materials and installation requirements depend on the selected system; this does not imply a brand affiliation.

What to look for

Signs it’s time
for a closer look.

These are reasons to have the area evaluated—not a diagnosis or an automatic recommendation to replace everything.

New grout or caulk can address some maintenance issues, but it does not rebuild a failed waterproofing system. We help distinguish a surface repair from work that needs removal and reconstruction.
What the work involves

A clear scope.
A better starting point.

PHASE 01

Plan the layout

Discuss shower size, entry, tile, storage, fixture positions, and any accessibility goals.

PHASE 02

Build the assembly

Define demolition, substrate repairs, waterproofing, drain coordination, and any system testing or inspection required before tile.

PHASE 03

Set & finish

Plan tile layout, transitions, grout, sealant, trim, and cleanup. Follow material cure times before putting the shower into use.

Your written estimate is the project agreement. It defines the actual materials, preparation, installation, exclusions, and any permit or trade work. The guide above explains typical considerations; not every item is included in every project.
Bathrooms & tile showers

What we can help with.

Every property is different. Your estimate will define the specific materials, preparation, installation, and finish work included.

  • ↗  Walk-in tile showers and shower surrounds
  • ↗  Ceramic and porcelain floor and wall tile
  • ↗  Shower waterproofing and substrate preparation
  • ↗  Vanities, trim, painting, and grab-bar installation
Planning your project

Prepare the foundation

Review existing surfaces and address the preparation included in your estimate.

Choose your tile

Plan tile size, layout, grout, transitions, and shower details together.

Finish with care

Complete grout, sealant, and finish details according to the chosen materials.

Before we begin

Questions worth discussing.

What should I send when requesting an estimate?

Tell us your project location, the work you want completed, and your preferred timing. Photos, rough dimensions, and examples of finishes you like help us understand your goals.

How are materials and additional work handled?

Your written estimate defines the materials and work included. If concealed damage or a requested change affects the scope, we discuss the additional work before proceeding.

What about permits and other trades?

Permit requirements and the responsibilities for plumbing, electrical, HVAC, and any engineering are reviewed for the specific project and documented in the proposal.

Let's build something better

Your next project starts with a conversation.

Tell us what you have in mind. We’ll help define the next step.

Start your project ↗